01 · Fit-out delivery in Saudi Arabia

From bare shell to handover,
under control.

Watad runs the entire fit-out lifecycle: costing, procurement, spaces, quality, handover. Bilingual, offline-first, and built for owner-side teams and the contractors who build with them.

02 · Plan it before you spend it

The budget exists before the first order does.

Run mode, BOQ, budget ceiling, roles: set once at onboarding, so every purchase that follows has something to be checked against.

03 · Nothing moves without approval

The materials wait for the right decision.

Over-threshold spend holds for the owner's approval. Recorded, audit-linked, and only then does the delivery reach the site.

04 · From delivery to structure

What arrives on site becomes the building itself.

Every material is tied to the record that ordered it, so what goes into the wall is exactly what was tracked, approved, and paid for.

05 · One product, many shapes

The same build, laid out however it needs to be.

Run mode, space model, item tracking: configured once at setup, so the product takes the shape of how this project actually works.

06 · Every space, laid out

Spaces, zones, and every item inside them.

Spaces and items live on the same record: what belongs in which space, at what quantity, tracked as it goes from ordered to installed.

07 · From wireframe to real

What was drawn is what got built.

Nothing left to argue at the end: the structure that went up matches the plan, the budget, and the record kept the whole way through.

08 · Prove it from site

Scan a space, see its status change instantly.

Contractors capture progress on the phone already in their hand: photos, snags, status, synced the moment there's signal and queued the moment there isn't.

09 · Nothing is signed off blind

A space isn't done until every check passes.

Sign-off is blocked while any item on the checklist is open. The gate is absolute, so "finished" always means finished.

10 · Handover, done right

A finished project with the paper trail to prove it.

Every sign-off, every approval, every photo: still there, still linked, the day the keys change hands and the day the warranty is tested.

Handover, done right

A finished project with the paper trail to prove it.

Every space, every item, every riyal. Anchored.

Set up your organization, pick your project modes, and put a code on the first door frame today.